Write a tracking plan in an afternoon

A tracking plan does not need to be a 40-tab spreadsheet. A short method for deciding what to track, naming it well and keeping it clean as the product grows.

Luis Ferraz

Solutions Engineer

A white database icon on a dark navy dithered field

The tracking plans I see in onboarding calls tend to fall into two groups. Some teams have none, and track whatever an engineer thought of while building a feature. Others have a spreadsheet with 400 rows, most of them out of date.

Both end up in the same place: nobody trusts the data, so nobody uses it. A good plan sits in between, and you can write a first version in one afternoon.

Start with five questions, not events

Do not open the spreadsheet yet. Get the product lead, an engineer and whoever owns growth in a room and write down the five questions you most want answered in the next quarter.

Good questions are specific and lead to a decision:

  • Where do new users drop off before they see value?

  • Which first-week actions predict that a team is still active in week 8?

  • Does the new onboarding checklist change activation?

  • Which plan limits do customers hit before they upgrade?

  • How many teams use export, and does it predict renewal?

Every event in the plan should help answer one of these. If it does not, leave it out for now. You can always add it later; you cannot easily remove events people have started to depend on.

Name events the same way, every time

Pick one naming convention and stick to it. We recommend action_object, past tense, in snake case.

Good

Avoid

Why

created_project

Create Project, newProj

Mixed case and verbs

invited_teammate

invite_sent_v2

Version numbers in names

exported_report

click_export_button

Describes UI, not intent

upgraded_plan

upgrade, plan_upgraded

Inconsistent order

The third row is the one that matters most. Track what the user achieved, not which button they pressed. Buttons move in every redesign; “exported a report” stays meaningful for years.

Put detail in properties

A common mistake is creating a new event for every variation: exported_report_csv, exported_report_pdf, exported_report_png. Use one event with a property instead.

neural.track("exported_report", {
  format: "csv",
  rows: 1240,
  source: "dashboard",
});
neural.track("exported_report", {
  format: "csv",
  rows: 1240,
  source: "dashboard",
});
neural.track("exported_report", {
  format: "csv",
  rows: 1240,
  source: "dashboard",
});
neural.track("exported_report", {
  format: "csv",
  rows: 1240,
  source: "dashboard",
});

Now one chart shows all exports, and a breakdown by format shows the split. Aim for three to six properties per event. Always include anything you might want to filter or group by later, such as plan, platform or feature area.

Identify people early and consistently

Most broken funnels I debug come down to identity. A visitor browses anonymously, signs up, and becomes a second person in the data because the app never linked the two.

Call identify as soon as you know who someone is, with the same stable user id your database uses. Never use an email as the id, because emails change. Set account-level properties like plan and company size on the group, not on each event.

Write the plan down where people will see it

The plan itself can be a short table: event name, when it fires, its properties, and which of the five questions it serves. For most products, the first version is 20 to 35 events.

Keep it next to the data, not in a separate document. In Neural, every event has a description field and an owner, and both show up wherever the event is used. Mark events as verified once an engineer has checked them in the live events view, and as deprecated when you stop sending them.

Keep it clean

A plan decays without upkeep. Three habits keep it healthy:

  1. Review new events in pull requests. Add the tracking plan table to the PR template, so new events are named before they ship.

  2. Block unplanned events in production. Neural can reject or quarantine events that are not in the plan, so typos never reach a chart.

  3. Prune every quarter. Any event nobody has queried in 90 days is a candidate for deprecation.

That is the whole method. One afternoon for the first version, ten minutes per pull request after that, and an hour a quarter to tidy up.

tracking plan

instrumentation

guides

Portrait of Callum Pryce

Written by

Luis Ferraz

Solutions Engineer

Keep reading

Buy template

Create a free website with Framer, the website builder loved by startups, designers and agencies.